Tuesday, October 12, 2010

Hiding in Plain Sight Part 2: Unmasked

Post-Dispatch unmasked 01.jpg
Comments on my previous post about the building at the northeast corner of Tucker and Chouteau inspired me to find some photos I took of the former Post-Dispatch Building several blocks north at Tucker and Olive. Many of you probably remember this dramatic transformation in 1999, when the metal curtain wall slip cover was removed revealing the stone facade beneath.

Post-Dispatch unmasked 03.jpg
The hidden Beaux Arts Classical designed building by George D. Barnett (who also designed the Arcade Building) had been completed in 1917 as the new home of the St. Louis Post-Dispatch, the leader amongst several competing St. Louis newspapers. In 1960, the Post-Dispatch vacvated the building, moving to a larger building several blocks north at 900 N. Tucker Boulevar. New owners of the building must have been looking for a way to compete against newer modern office buildings rising Downtown and in the emerging business district of Clayton. Their answer was to fill in all the large windows with cinder block, cover the upper floors with a metal curtain wall and encase the lower two floor with black pre-cast concrete panels. The tiny remaining window openings were less than a quarter of the original size and hidden by metal mesh strips in the curtain wall.

Post-Dispatch unmasked 04.jpg
Thirty four years later, in 1999, the re-muddling was stripped away and the building was placed on the National Register. Historic Tax Credits were used to fully restore the building including re-building missing stone details and parts of columns at the first floor, new historic replica windows and storefronts. While the original balustrade parapet was not re-built, a new cornice made of modern materials to resemble stone was included.

IMG_9583.JPG
The former Post-Dispatch Building today. Other than some slight color variations in the decorative band course between the sixth and seventh floors, one would never guess that this beautiful building was hidden for over three decades.

Tucker Boulevard 1917.jpg
Tucker Boulevard circa 1917 - Photo from the building's National Register nomination. The nine story building to the north as well as the tiny two story between have been replaced by a parking garage. Farther north, the former A.D. Brown Building, now the Meridian is the only building that has not been demolished or truncated.

IMG_9581.JPG
One block to the north and east at the northeast corner of 11th and Locust is another building early 20th century building which was "modernized". The Locust Building, which is home to the City's Community Development Agency and the St. Louis Development Corporation, at least retains the same number of windows as it did originally, although the height of the windows was reduced to a dimension slightly taller than the brick bands between the originals. There are no plans to unsheath this building, in fact the current owners have made some improvements in the last few years in keeping with the current modern design of the building.

1015 Locust before cladding.jpg
A photo of the building prior to its covering with aluminum curtain wall. The photo is from the former owner's now defunct website which gave a brief history of the building. The concrete frame structure was built as an annex for the giant Rice-Stix dry goods company which had previously built the Merchandise Mart building on Washington Avenue. A five story bridge still connects the upper floors of the two buildings. Rice-Stix also built an annex that now houses the 10th Street Lofts.

Friday, October 1, 2010

Hiding in Plain Sight

12th & Chouteau 1925.jpg
I was recently looking at a collection of historic Route 66 photographs including St. Louis when I stumbled upon this view above of 12th and Chouteau from 1925. I immediately thought of the nearly blank orange brick box that sits at the northeast corner of the intersection. The way it hugs Chouteau and the entrance of the Tucker Boulevard viaduct heading into Downtown had always made me suspect that it is older than it looks, but never did I imagine that the building began its life as the beautiful neoclassical bank pictured above. According to City property records, the bank was constructed in 1924.

IMG_9185.JPG
At some point, in the late 1960's or 1970's the building became part of Checkerboard Square, the headquarters of Nestle Purina, and was sheathed in orange brick to match several other buildings on the corporate campus.

IMG_9176.JPG
A steel security door centered on the blank brick front of 1111 Chouteau gives little clue of the former columned grand bank entrance. Only the projection of the center of the facade follows the form of the hidden architectural details.

IMG_9173.JPG
The seven double height arched windows which faced Tucker and no doubt opened into a grand 2-story banking hall have been reduced to a series of brick bars giving the building the appearance of a jail.

Picture 30.png
The east facade is not much better, with the brick bars continuing at the ground floor and a thin slot of strip windows at the second floor, which was likely inserted into the bank hall.

IMG_9181.JPG
I wondered what could be housed in this horribly re-muddled brick box? Maybe computer servers?, maybe the campus maintenance department? There is no signage on the public facades of the building even indicating it is part of Purina or what it contains. I was quite surprised to learn after a quick Google search that 1111 Chouteau is home to Checkmark Communications, Nestle Purina's in-house creative communications and design agency. What!? The staff of "creative communications and design agency" of a major corporation are housed in this thing? Maybe there would be more creativity going on if the orange brick skin was ripped off and those wonderful large windows opened again.

Monday, September 27, 2010

LRA & Preservation Board Spare the Green Flounder

Laura Costello, Director of the City's Land Reutilization Authority (LRA) spoke tonight to the Preservation Board asking for a 6 month extension from demolition for the green painted flounder house at 3533 Missouri Avenue. The house had been condemned for demolition by the Department of Public Safety last September. She said the LRA would like to do some special marketing for the house to find a someone to rehabilitate it including placing it on their Featured Properties List.

The 925 square foot home is located in the Benton Park National Register Historic District, making it eligible for Historic Rehabilitation Tax Credits. The unusual rear of the lot frame flounder is listed in the City's real estate records as being built in 1884. The Preservation Board voted to approve the extension.

Next, though the Preservation Board approved the demolition of 5148 Enright against the Cultural Resources staff recommendation. While as Cultural Resources Office Preservation Planner Bob Bettis testified the porch of this house needs some attention, the home itself is structurally sound without major damage. The Preservation Board agenda for the home shows an analysis of rehabilitation cost after factoring in Federal and State Historic Tax Credits at $112,200.00. The house is a contributing property in the Mount Cabanne - Raymond Place National Register Historic District.

18th Ward Alderman Terry Kennedy however testified in favor of demolition, stating that since the house to the east of 5148 Enright (vacant lot shown above) was demolished after an arson fire, and this one would probably be next in line for an arson fire. I'm not sure how this claim can be pointed at this house and not every other vacant home in the area? He did mention that the owner of the occupied home next door is having problems getting insurance. Again though, I find it hard to believe that no one would insure this owners home and this could theoretically be claimed as a reason to demolish every vacant house next to an occupied house in the City. None the less, the Preservation Board voted for demolition.

The Preservation Board also voted to allow the demolition of a Mid-Century Modern building at 3663 Forest Park upon the application of a building permit for a new five story Best Western hotel. The board wisely chose to hold the building permit requirement as recommended by the Cultural Resources staff. The developer tired to claim that a survey of the property could not be done without demolition of the building, but even Richard Callow, one of the few non-architect or engineers present called this bluff.

The design of the new hotel, while much better than what had been originally proposed in 2007, seems to have been downgraded from that shown last year in this Central West End Midtown Development report.

Wednesday, September 22, 2010

An Unrecognizable Intersection

Gaslight Sq tornado 1959 01.jpeg
I'm a big fan of old photographs of St. Louis, particularly street scenes. I recently came across a link to search the image archives of Life Magazine through Google, and of course searched St. Louis. Beyond many fashion shots in WU's quad (which are fascinating), baseball, the zoo, Veiled Prophet, etc., a few images of major debris in the streets caught my eye. The images are simply labeled "St. Louis Tornado". The intersection above would otherwise have been almost unrecognizable, but my knowledge of the patterns of devastation brought by major tornadoes through St. Louis history told me that this must be 1959 and somewhere around Gaslight Square.

Gaslight Sq tornado 1959 02.jpeg
Everything visible in the first image has been gone since before my memory, so while I knew the general location, placing the intersection did not come immediately. After looking at a few more images, I recognized I recognized a row of buildings that I do remember, and realized the location was Boyle at Olive. What makes the intersection hard to place is not only the clearance of buildings, but the complete re-configuration of the intersection.

Gaslight Sq tornado 1959 03.jpeg
Looking east on Olive just west of Boyle. The building on the southwest corner of the intersection was known as the Musical Arts Building long before becoming home to Gaslight Square venues and had been since at least 1909 as its name appears on the Sanborn map below.

Gaslight Sq tornado 1959 04.jpeg
Damage to the Musical Arts building from the tornado was extensive, but not devastating and the building was repaired and put back into use.

Just three years later on the night of January 10th, 1962, a major fire struck the Musical Arts Building. The photos above and below are from a Post Dispatch photo gallery of the enormous fire caused by a grain explosion at Ralston Purina's mill on Gratiot that occurred the same night. The building just west of the Musical Arts in the photo above was one of the first to go prior to the mass demolitions for Citirama and can be seen in my second Gaslight post in 2007.
The aftermath of the fire left the building, sidewalks and street all coated in thick layers of ice. Like a cat with nine lives though the Musical Arts Building was re-built again. The building for many years housed the studio of artist Ernest Trova. According to the Post, the it was finally demolished sometime in the 1970's.

Boyle-Olive Sanborn.jpg
As this 1909 Sanborn Map of Gaslight Square shows, originally Boyle and Pendleton each ended in T intersections at Olive about 260 feet apart. At some point however, possibly due to perceived traffic problems around Gaslight Square, Boyle and Pendleton were joined by the taking of several properties, clearance through demolition and construction of a curved connector. South of Westminster Place, Boyle remains a standard street with 36 feet of pavement (two 10' driving lanes & two 8' lanes). The new connector however was built with a whopping 50 feet of pavement or four 12.5' lanes. For comparison, standard lane width for interstates is 12'.

Boyle-Olive Aerial.jpg
An aerial photo today shows the dramatic change that came with the reconfiguration of the streets. While a four way stop has been put in at Olive, the overbuilt infrastructure still has the feel of a high speed collector road in some far flung suburb. The architecture of the townhouses that have been built in the area, with the exception of a condo building at the southeast corner does not help the feeling of the road.

Gaslight Sq tornado 1959 06.jpeg
The building at the end of the T in the first photo survived the tornado, but as photos below from the Western Historical Manuscript Collection show, it was re-built as a stripped down ghost of its former self. The bays, while damaged, seemed repairable, but were stripped off along with the decorative brickwork only to be replaced with pairs of windows punched in a blank facade.

Except fro a coat of white paint, the only thing unaltered was the iron canopy extending over the terrace. This building was demolished along with others for the reconfiguration of Boyle and Pendleton.
Another view from the intersection looking east. The painted building in the center would survive until 2003. More photos of those can be seen in my first Gaslight Square post.

the new Gaslight Square
The "new" Gaslight Square looking east from Boyle. Photo by Marjie Kennedy. A fairly attractive 3-story condo building has since filled out the corner behind the columns. The only things recognizable from the old photos are the gas light poles and the Continental Building in the distance. The northeast and southwest corners of the intersection are still empty lots. Hopefully someday something worthy of this storied location will be built there.

Tuesday, September 21, 2010

Reminder: Missouri Tax Credit Public Hearing Tonight!

Paul Brown Lobby.jpg
Just a reminder that Jay Nixon's Tax Credit Review Commission is holding a public hearing tonight from 3:00 to 9:00 pm at the Old Post Office at 815 Olive Street. Public testimony regarding the tax credits will be taken from 4:00-6:00 and 7:00-9:00, so you do not need to be present for the entire evening.

The photo above is of the restored lobby of the Paul Brown Loft Apartments, which are right across Olive from the Old Post Office. This building and dozens more would not have been restored if it was not for the Missouri Historic Rehabilitation Tax Credit. Like the Ambassador Theater Building and many others that were demolished before 1998, the Paul Brown could have very well ended up meeting the wrecking ball. Instead, it was renovated for a new use which with all of the other historic tax credit projects has brought a renewed vibrancy to Downtown St. Louis. Please consider taking an hour or two of your time tonight to come let the Tax Credit Review Commission know that Missouri should not cut Historic Tax Credits, but that we should continue to be a leader instead of the "show me" state.

Wednesday, September 15, 2010

Remembering the Good Years at St. Louis Centre

St. Louis Centre Grand Opening 02.jpg
When St. Louis Centre finally had its grand opening after over a decade of planning in August 1985, there was great anticipation by the City's civic leaders that shoppers would return to Downtown St. Louis. For the first several years of its existence, they were right. The siphoning of shoppers away from Downtown to newer sprawling suburban shopping centers had been occurring for over three decades, and now the table had been turned. It had been almost 10 years since a major mall debuted in the St. Louis region (Chesterfield 1976), and most of the area's other major shopping centers were approaching 20-30 years of age and had lost their luster (Westroads: 1955, Northland 1955, Crestwood:1957, River Roads: 1961 South County 1963, Northwest Plaza: 1966, West County 1969). St. Louis Center was the place to shop whether you lived in St. Louis, its suburbs or were just visiting from out of town.

St. Louis Centre Grand Opening 01.jpg
Comedian Bob Hope was featured at the opening festivities.

When opened, St. Louis Centre was claimed to be the largest urban shopping center in the U.S. in retail square footage, rivaling even Chicago's giant Water Tower Place. A local reporter compared the mall to a luxurious "ocean liner" due to its almost all white interior and exterior finishes. The mall's enormous barrel vault skylights and walls of glass at the entrances reminiscent of the Crystal Palace or Milan's Galleria Vittorio bathed its interior with daylight. St. Louis Centre even made the cover of the book Interior Pedestrian Places, which features great public interior spaces throughout the world.

Interior Pedestrian Places - St. Louis Centre.jpg
Cover and image below from: Interior Pedestrian Places

1985 was a year that had St. Louis flying on a high that was unmatched since the mid 1960's. Not only was the $95 million dollar St. Louis Centre opened, but Union Station, which had been closed in the early 1970's was renovated into a festival market and hotel by the Rouse Corporation. Between 1981 and 1985 St. Louis led the nation in the use of Federal Historic Tax Credits with $436 million in renovation projects including over 1600 units by the Pantheon Corporation in DeBaliviere Place and dozens of buildings in Laclede's Landing. A glowing article in Fortune Magazine lists these achievements and much more, declaring St. Louis "a place with a future".

St. Louis Centre Interior.jpg

Many people have said that St. Louis Centre was detrimental to street-front retail in Downtown St. Louis. The vast majority of the stores that opened in St. Louis Centre however were new to Downtown St. Louis. Many including Abercrombie & Fitch, The Sharper Image and others were brand new to the St. Louis retail market. While the shoppers that patronized the stores in the enclosed St. Louis Centre for the most part did not did not add any vitality to the streets, it is hard to argue against the fact that the Centre attracted shoppers who had not thought about coming Downtown for years.

St. Louis Centre Aug 11 1985 PD.jpg
August 11th, 1985 (this and photos below from the St. Louis Post-Dispatch)

Beyond the expansive skylights and bright clean interior, St. Louis Centre had many design flaws that did not help its fate. When the Mercantile Center was planned a decade earlier, the first main retail level was to be at street level, with all of the service areas and loading docks located out of the way in a basement level. This would have drawn a lot of cut-through pedestrian traffic. Instead, to cut construction costs, the large loading dock and service area of the mall was built in the middle of the ground level, forcing potential shoppers coming in off the street to go up the second level to the stores. There were a few stores on each end at street level, but sacrificing the center of the first floor to service areas seriously hampered the ability of the mall to be integrated with the streets around it or adapt to changing needs of the Downtown market.

St. Louis Centre Nov 22 1985 PD.jpg
November 22nd, 1985

In 1986 the first section of the St. Louis Galleria opened in Richmond Heights, replacing the old Westroads Center. With only a remodeled Dillards in the original 1955 Stix Baer & Fuller and a relatively small number of stores, the Galleria barely made a dent in St. Louis Center's retail supremacy. Five years later in 1991 however the Galleria was more than tripled in size, with a new Famous Barr, Lord & Taylor and another 100+ stores, moving the region's retail center of gravity to Brentwood and Clayton Road. Even downtown Clayton, which had established a strong retail presence in the mid-1950's suffered. After the Galleria expansion opened, foot traffic and sales at both St. Louis Center and Union Station, which was reopened as festival market / mall just three weeks after the Centre, dropped significantly. Instead of encouraging people to stay Downtown to shop, busloads of conventioneers were regularly sent via charter bus to the Galleria. For St. Louis Centre, which had lost its newness factor, the future from this point on was only downhill.

St. Louis Centre Fredbird.jpg
Even Fredbird thought St. Louis Centre was the cool place to be.

Saturday, September 11, 2010

Missouri Tax Credit Public Hearing set for September 21st

Governor Nixon's Missouri Tax Credit Review Commission announced yesterday that one of five public hearings being held as part of its analysis of Missouri tax tredits will be held here in St. Louis on Tuesday September 21st. The beautifully restored courtroom above of the Missouri Court of Appeals at the Old Post Office - 815 Olive Street will be the venue for the meeting at which public testimony will be taken regarding the future of all Missouri tax credits including the Historic Rehabilitation Tax Credit. According to the agenda of the 6 hour session, two blocks of time from 4:00-6:00 pm and 7:00-9:00 pm will opened for public testimony.

As most everyone reading this knows, the Missouri Historic Rehabilitation Tax Credit since its inception over 10 years ago has been largely responsible for the dramatic re-birth of Downtown St. Louis and the continued restoration of dozens of St. Louis neighborhoods. Nixon's Tax Credit Review Commission is under orders to look at all Missouri tax credits and establish a plan for drastic cuts by Thanksgiving. For the Historic Rehabilitation Tax Credit this could mean a lower cap, or worse, a limited allocation system similar to the Low Income Housing Tax Credit which would politicize the process and result in a dramatic drop in the number of buildings that are renovated along with the jobs and tax revenue that are created in the process. This would be a self defeating move for Missouri, but one that is very much on the table for implementation.

This is YOUR chance to stand up and be heard. Please come to one of the public testimony sessions and tell the Commission that Historic Tax Credits are crucial to Missouri's economy and must not be slashed.